Getting Connected
What to expect when you've chosen to convert
Generally, it takes approximately four to six weeks to have the natural gas service line installed from the gas main to your home. The length of time can vary, however, depending on scheduling, permits, terrain, weather conditions and other factors. Once the underground line is completed, contact your heating contractor to have the interior gas piping installed and inspected. Make sure your heating contractor confirms the installation of the gas service with Washington Gas prior to removing your existing appliances. After your new equipment and piping is installed, you must call Washington Gas at 703-750-1000 to have your natural gas meter installed.
Please notify us at least 3 business days prior to the time you require service. Certain appliances may require separate metering (gaslights, pool heaters and back-up generators).
Call or Email us today and enjoy the benefits of natural gas service in your home. Call 703-941-HEAT or toll free 1-888-941-HEAT. We're Washington Gas... giving you energy, plus the time to use it.
|